Dec 19 – 1st Floor after finishing

Here are a couple of pictures taken by our builder.

Floor rebar before the pour looking south towards where the main bathroom will be

This is after the floor was poured and finished. Looking north towards the small bathroom

This is the floor in the large south east bedroom with support structure for ceiling slab as designed by the structural engineer

Dec 18 – Floor has been poured and Webcam pictures quit coming

According to our builder the floor is curing nicely and he has started building the support structure for the pouring of the ceiling concrete. However, there is no evidence of anything happening from the outside. We will try to get our builder to send a picture of what is happening on the inside.

Last Photo received on Dec 16th at 4:00 pm

The last picture from the webcam was uploaded at 4:00 pm on Friday. The temperature has been extremely cold overnight and it may have been so low that the camera  shutdown. Unfortunately those who we would normally ask to try to restart it have come down to the coast for Christmas. Therefore, there may not be any new pictures from the webcam for at least a week or so.