Dec 19 – 1st Floor after finishing

Here are a couple of pictures taken by our builder.

Floor rebar before the pour looking south towards where the main bathroom will be

This is after the floor was poured and finished. Looking north towards the small bathroom

This is the floor in the large south east bedroom with support structure for ceiling slab as designed by the structural engineer

Leave a Reply

Your email address will not be published. Required fields are marked *