All power, data, cable and telephone wires are in. The insulation people are on-site making the place all pink and warm. The heaters are on and the inside is already feeling much more comfy.
The excavating company was in moving material and back filling the area around the pump room. Our contractor is working out how to frame the pump room so it supports the deck above it. The structural engineer left that detail to the builder.
The Hardie plank siding has been order and delivery is planned for early next week.