Dec 12 – Pouring the first floor slab at -7°C

Even though the temperature was really cold, our builder has gone ahead and poured the concrete for the first floor slab. I guess the heaters will be running full out for a while.

Leave a Reply

Your email address will not be published. Required fields are marked *