Dec 6 – More Rock Slinging

It appears that the wall forms have been removed. The rock slinger is being used to put more rock into the building. The under slab plumbing and radeon collection pipes will need to be putĀ in place before the slab can be poured.

Leave a Reply

Your email address will not be published. Required fields are marked *