Feb 19 – Final Section of Railing Installed

The section of railing that was preventing the granting of our occupancy permit was installed recently. The installer didn’t take any pictures or inform us that it was done: Here is the railing now done:

These pictures were sent to the building inspector but unfortunately, she is on vacation until the beginning of March.

Leave a Reply

Your email address will not be published. Required fields are marked *