Nov 15 – ICF installation started

header

Yesterday and today the builder’s crews removed portions of the large retaining wall forms and started placing the ICFs.

Our Structural Engineer spent the weekend updating all of the 11 drawings to remove the garage as well as doing some minor revisions such as correcting window sizes.

We are getting a small reduction in the fixed price labour cost because the builder will not be building the garage. The removal of the garage should also reduce some material costs.