Nov 26 – Walls Poured

headerYesterday, the concrete for the exterior and internal walls was poured. Because of the potential for cold weather, the Structural Engineer requires that site be prepared for heating and samples of concrete be taken for testing at 4, 7, 14 and 28 days. Also the forms must remain in place until the concrete achieves a specified strength.

Leave a Reply

Your email address will not be published. Required fields are marked *