Nov 7 – More Concrete Poured

header

The weather cooperated today and allowed the concrete for the first floor of the retaining wall and the wall footings to be poured. The large retaining wall which is 2′ deep by 11′ high and 57′ long could only be poured at a  rate 3′ per hour but the crew had the concrete poured and tarped by 3:00 pm this afternoon. Because the retaining wall is so huge, the forms are to stay in place for 5 days.

Leave a Reply