Nov 9 – Tarps removed and ICF Blocks Delivered Posted on November 10, 2016 by admin The tarps have been removed (by the wind or the crew) and the ICF blocks for all the external foundation walls have been delivered. The builder needs to wait for the retaining wall’s concrete to set before all the forms can be removed.