Oct 18 Final Inspection

RDOS has started the final inspection process in preparation for granting our occupancy permit. Paperwork (Schedule C) is needed from both the Geotechnical Engineer and the Structural Engineer. An on-site inspection revealed a few issues. Some screws were missing in some doors and the backfill needs to be sloped away from the house. The stairs from the upper deck to the garage rooftop need a railing on the south side of the stairs (we knew this might be an issue). As well, the electrical work needs to be completed and the final electrical inspection called. Hopefully this can be completed soon.