The back portion of the boathouse has also been removed.
Today, the geo-grid material which came on a large transport truck that couldn’t get down North Beach Estates Road arrived. Fortunately our builder had a large enough pickup truck to move the huge rolls of material down to our property – they were 4m in length. Our builder believes that the Geo-tech ordered far too much material. He will discuss this with the Geo-tech when he returns on Tuesday.
After the geo-grid material is installed on Tuesday, our builder will bring in a rock slinger which we are renting from a different excavating company to move the rock from many dump truck loads into the hole.